Contents

  • 1 Methods of River Bank Protection
    • 1.1 1. Brick Pitching 
    • 1.2 2. Stone Riprap 
    • 1.3 3. Boulder Pitching 
    • 1.4 4. Concrete Slab Lining 

Methods of River Bank Protection

4 methods of river bank protection are as follows:

  1.  Brick Pitching
  2. Stone Riprap
  3. Boulder Pitching
  4. Concrete Slab Lining 
Method of River Bank Protection

1. Brick Pitching 

In this method of river bank protection, first of all, around 3m length of bamboo or timber piles are driven along a line about 1 m away from the toe of the river embankment, and the center to center distance between one pile and the next pile is kept 15 cm.

The layer of brick flat soling is provided on the space between the toe and the pile line. Then usually, 15 cm thickness of cement concrete (1:3:6) is laid over the brick flat soling on the room between the toe of the embankment and the pile line. 

Methods of River Bank Protection - Brick Pitching method

The sloping side of the bank is protected by double-layer brick pitching with cement mortar of 1:6 ratio.

2. Stone Riprap 

In this method of bank protection, Around 3 m length of timber piles are driven at 1 m center to center along the line about 1 m away from the toe of the embankment. The piles are projected about 45 cm above the ground surface. 

Methods of River Bank Protection - Stone Riprap method

Then the boulders enclosed in wire net is provided along the space between the toe and the pile line. And for the protection of the sloping side of the embankment, stone riprap finished with cement mortar is provided.

3. Boulder Pitching 

In this method of river bank protection, around 4 m to 5 m length of timber piles are driven at 1 m center to center, along the line about 1 m away from the toe of the embankment. The piles are projected about 50 cm above the ground surface.

Methods of River Bank Protection- Boulder Pitching method

Then, within the space between the toe and the pile line, two layers of boulder apron are provided. The sloping side is lined with boulder pitching which is finished with cement mortar.

4. Concrete Slab Lining 

In this method of bank protection, A wall is constructed along the bank of the river. This type of wall is called the toe wall. 

Then the concrete slabs are placed on the space between the toe of the embankment and toe wall,  and it is set by using cement mortar. The sloping side of the embankment is lined with concrete slabs, and joints are finished with cement mortar.

Methods of River Bank Protection - Concrete Slab Lining method

Depending on the site condition, concrete slabs may be of different sizes. Usually, the size of the concrete slab (50 cm X 50 cm X 10 cm) is used.

Read More:

Types of Irrigation

Advantages of Canal Lining

Hydrology, Irrigation Engineering

Post navigation

Previous Post: Cutback
Next Post: Failure of Tube Well

Related Posts

  • Relation Between BASE, DELTA and DUTY Irrigation Engineering
  • Empirical Formula Used For Determination of Runoff
    Empirical Formula Used For Determination of Runoff Irrigation Engineering
  • Determine the Discharge of the Channel for which it is to be Designed
    Determine the Discharge of the Channel for which it is to be Designed Irrigation Engineering
  • How to Calculate Annual Runoff || Problem & Solution ||
    How to Calculate Annual Runoff || Problem & Solution || Irrigation Engineering
  • Failure of Tube Well Hydrology
  • Under-Sluices And Their Function Canal Headwork
  • 10 Factors Affecting Duty of Water || Irrigation Engineering Irrigation Engineering
  • Canal Fall - MCQ
    Canal Fall – MCQ Irrigation Engineering
  • 14 Advantages and Disadvantages of Drip Irrigation System Irrigation Engineering
  • 5 Factors Affecting The Water Requirement of Crops || Irrigation Engineering || Irrigation Engineering

Categories

  • Highway engineering
  • Railway Engineering
  • BMC
  • WasteWater
  • soil
  • CONCRETE
  • Building Construction
  • Irrigation Engineering
  • Hydraulic Structure
  • water
  • Cement
  • Foundation Engineering
  • Aggregate
  • Mathematical Example
  • Tunnels
  • Survey Engineering
  • PAVEMENT DESIGN
  • Hydrology
  • PAVEMENT DESIGN – MCQ
  • Building Material
  • Floors
  • Highway Engineering – MCQ
  • HYDROLOGY M.C.Q
  • Engineering Geology – M.C.Q
  • Railway Engineering – MCQ
  • Water Supply – MCQ
  • Building Materials – MCQ
  • Soil Engineering – MCQ
  • Irrigation Engineering – MCQ

Popular Posts

  • 40+ Best Online Furniture Stores || Cheap furniture stores || High-end furniture stores || Discount furniture || Outdoor & Indoor Home Furniture Stores
  • 10 Types of Roads Classification in India(Urban & Non-Urban Road)
  • 3 Characteristics of Sewage – Physical, Chemical and Biological Characteristics
  • TYPES OF RAILS – Double Headed, Bull Headed and Flat Footed Rails
  • 6 Types of Classification of Gradient – Ruling, Limiting, Exceptional, Minimum, Average and Floating Gradient
  • Railway Gauge – || Definition || Types || Factor Affecting || Advantages of Uniform Gauge ||
  • 8 Different Types of Cement Test || Building Materials & Construction
  • History of Road Development in India
  • 100+ All Traffic Signs or Road Safety Signs in India as per IRC
  • Moving Stairs BMC
  • Ultimate Compressive Load for an Axially Loaded Short Column
    Ultimate Compressive Load for an Axially Loaded Short Column R.C.C. Structure
  • Advantages And Disadvantages of Irrigation Irrigation Engineering
  • Qualities of Good Building Stone
    Qualities of Good Building Stone Building Construction
  • Sludge Drying Bed – Wastewater Treatment WasteWater
  • Water Demand - MCQ || Water Supply Engineering
    Water Demand – MCQ || Water Supply Engineering Water Supply - MCQ
  • Origin and Formation of Soils – MCQ Soil Engineering - MCQ
  • Reconnaissance Survey – Highway Engineering Highway engineering

Primary Menu

  • Home
  • About us
  • Contact

Top Posts & Pages

  • Advantages and Disadvantages of Traffic Signals
  • How To Calculate True Bearing From Magnetic Bearing - || Rules and Example||
  • E-Waste - MCQ || Environmental Engineering ||
  • Swedish Circle Method For Analyzing The Slope Stability
  • 42 Types of Map Symbols - With Their Sketch Drawing and Colour ||Civil Engineering Surveying Symbols||

Copyright © 2022 Civil Engineering.

Powered by PressBook News WordPress theme