Lead and Lift in Earthwork

Lead And Lift

The horizontal distance through which the excavated earth from a borrow pit is carried to the place of the embankment is known as lead.

The vertical height through which the excavated earth from a borrow pit is to be lifted is known as lead.

Read Also:

Turfing

Spoil Bank

Scroll to Top