Preliminary Survey || Method || Important Point-Highway Engineering
The survey of highways can be completed in four Stages (map study, reconnaissance survey, preliminary survey, final location and detailed […]
The survey of highways can be completed in four Stages (map study, reconnaissance survey, preliminary survey, final location and detailed […]
For bituminous road construction, various steps and techniques are used such as interface treatment (tack coat, prime coat), surface dressing,
Recommended Values of Camber For Different Types Of Road As Per I.R.C For different types of road, I.R.C recommended the
An area is said to be waterlogged when the sub-soil water table comes within 1 m below the ground level.
Factors Affecting The Length Of Transition Curve The length of transition curve depends upon the following factors: Rate of change
4 Functions of Camber Or Cross Slope The following are the 4 functions of camber or cross slope: 1. To
Necessity of Providing Extra Widening of Pavement on Curve On curves, the following difficulties are observed, that why extra widening
Transition Curve When a vehicle travelling on a straight course(i.e of infinite radius) enters a curve of finite radius, a
Necessity of Providing Joints in Cement Concrete Road Joints are provided in cement concrete road (pavement) to achieve the following
Types Of Joints In Cement Concrete Road The joints provided in cement concrete road are classified into the following two