The rolling stock includes locomotives, coaches and wagons. The rolling stock must be maintained in perfect order. Following are some important point should care during the process of maintenance.

Maintenance of Rolling Stock
  1. The worn-out portions of the rolling stock should be replaced from time to time.
  2. The various parts of the rolling stock must be washed or cleaned every day.
  3. The lubrication of all reciprocating parts and bearings should be carried out.
  4. The axles which have already complete running length 322000 km should be changed by a new one
  5. Locomotive boilers must be carefully maintained and renewed every 15 years.
  6. The useful life of a passenger train is considered as 30 years. After 30 years, it is to be dismantled and reassembled, even though it is not worn out.

Read More:

Railway Water Columns

Railway Engineering

Post navigation

Previous Post: Kolkata Metro – India’s First Underground Metro
Next Post: Difference between Natural & Mechanical Ventilation in Tunnel

Related Posts

  • Effects of Creep of Rails Railway Engineering
  • Factor Affecting The Selection Of Gradient For Railway Track Railway Engineering
  • How to Find Crossing Angle in Railway – Mathematical Problem & Solution Mathematical Example
  • Prevention of Creep of Rails Railway Engineering
  • Classification of Tunnel Drainage System Highway engineering
  • Composition of Rail Steel
    Composition of Rail Steel Railway Engineering
  • Kolkata Metro – India’s First Underground Metro Railway Engineering
  • Kinks in Rails || Railway Engineering || Railway Engineering
  • 4 Requirements of an Ideal Transition Curve In Railway Railway Engineering
  • Railway Ballast - MCQ || Railway Engineering ||
    Railway Ballast – MCQ || Railway Engineering || Railway Engineering

Categories

  • Highway engineering
  • Railway Engineering
  • BMC
  • WasteWater
  • soil
  • CONCRETE
  • Building Construction
  • Irrigation Engineering
  • Hydraulic Structure
  • water
  • Cement
  • Foundation Engineering
  • Aggregate
  • Mathematical Example
  • Tunnels
  • Survey Engineering
  • PAVEMENT DESIGN
  • Hydrology
  • PAVEMENT DESIGN – MCQ
  • Building Material
  • Floors
  • Highway Engineering – MCQ
  • HYDROLOGY M.C.Q
  • Engineering Geology – M.C.Q
  • Railway Engineering – MCQ
  • Water Supply – MCQ
  • Building Materials – MCQ
  • Soil Engineering – MCQ
  • Irrigation Engineering – MCQ

Popular Posts

  • 40+ Best Online Furniture Stores || Cheap furniture stores || High-end furniture stores || Discount furniture || Outdoor & Indoor Home Furniture Stores
  • 10 Types of Roads Classification in India(Urban & Non-Urban Road)
  • 3 Characteristics of Sewage – Physical, Chemical and Biological Characteristics
  • TYPES OF RAILS – Double Headed, Bull Headed and Flat Footed Rails
  • 6 Types of Classification of Gradient – Ruling, Limiting, Exceptional, Minimum, Average and Floating Gradient
  • Railway Gauge – || Definition || Types || Factor Affecting || Advantages of Uniform Gauge ||
  • 8 Different Types of Cement Test || Building Materials & Construction
  • History of Road Development in India
  • 100+ All Traffic Signs or Road Safety Signs in India as per IRC
  • What is Earth Road & Gravel Road
    What is Earth Road & Gravel Road Highway engineering
  • Sieve Analysis and Sedimentation Analysis -Measurement of the particle size distribution of soil soil
  • Bearing Plates in Railway || Railway Engineering || Railway Engineering
  • 3 Types of Soil Samples – Undisturbed, Disturbed and Non representative Soil Sample soil
  • Method of Test For Bleeding of Concrete CONCRETE
  • 10 Difference Between Flexible and Rigid Pavements Highway engineering
  • Problems Of Road Construction In Water Logged Area And Their Solution Highway engineering
  • How To Calculate Equivalent Single Wheel Load(ESWL) Highway engineering

Primary Menu

  • Home
  • About us
  • Contact

Top Posts & Pages

  • Advantages and Disadvantages of Traffic Signals
  • E-Waste - MCQ || Environmental Engineering ||
  • How To Calculate True Bearing From Magnetic Bearing - || Rules and Example||
  • Swedish Circle Method For Analyzing The Slope Stability
  • 42 Types of Map Symbols - With Their Sketch Drawing and Colour ||Civil Engineering Surveying Symbols||

Copyright © 2022 Civil Engineering.

Powered by PressBook News WordPress theme