Traffic Engineering – MCQ
1. Which of the following parking patterns allows the maximum number of car/vehicles parking facility
a) Parallel parking
b) Righ angle parking
c) 450 angle parking
d) 750 angle parking
View Answer
b) Righ angle parking.
The right-angle parking(90 angle parking) pattern allows for a maximum number of car/vehicle parking facility
2. The color of light used in the road for visibility during fog is
a) Red
b) Yellow
c) Green
d) White
View Answer
b) Yellow
3. Structural number (SN) of a flexible pavement is a function of
a) Layer co-efficient
b) Depth of the layer
d) Both (a) and (b)
View Answer
d) Both (a) and (b)
4. A bituminous pavement over a lean cement concrete base is a
a) flexible pavement
b) Rigid pavement
c) Semi-rigid pavement
d) None of these
View Answer
c) Semi-rigid pavement
5. Cloverleaf is a type of intersection of which of the following types?
a) Flyover
b) Interchange
c) Space sharing intersection
d) Time-sharing intersection
View Answer
b) Interchange
6. In a traffic stream if demand is distributed uniformly, the peak hour factor will be near to
a) 0
b) 0.5
c) 1
d) None
View Answer
c) 1
7. The concrete edge expected to sustain infinite no. of repetitions for a stress ratio of
a) 0.55
b) 0.50
c) 0.45
d) 0.40
View Answer
c) 0.45
8. ESWL at depth 2S is equal to
a) 3P
b) 2P
c) 0.5P
d) P
View Answer
b) 2P
9. As per IRC, traffic sign of speed limit should be
a) Circular shape
b) Triangular shape
c) Hexagonal shape
d) Octagonal Shape
View Answer
b) Triangular shape.
Read More: