Permanent Way – MCQ || Railway Engineering ||
Permanent Way – MCQ 1. Permanent track is regarded to be a) Semi elastic in nature.b) Elastic in nature.c) Rigid […]
Permanent Way – MCQ 1. Permanent track is regarded to be a) Semi elastic in nature.b) Elastic in nature.c) Rigid […]
Road Maintenance – MCQ 1. Road maintenance jobs include a) Maintenance of road pavement.b) Maintenance of road shoulders.c) Maintenance of
Rails – MCQ 1. Which type of rail is mostly used in railway track a) Double head railsb) Bull head
Hill Roads – MCQ 1. The wall provided above the formation of a hill road is known as a) Parapet
Necessity of Road Drainage Road drainage is necessary because of the following reasons: 1. Variation of the moisture content in
Railway Signalling – MCQ 1. Which signal gives permission to the train for leaving the platform a) Semaphore Signalb) Warner
Bearing Plates in Railway Bearing plates are cast iron, wrought iron, or mild steel plate which are placed in between
Road Drainage – MCQ 1. The system of condition and disposal of surface water within the right of way of
Find the Correction for Curvature Mathematic Problem Find the correction for curvature for a distance of 900 m and 2.5
Railway Stations & Yards – MCQ 1. A place on the railway line at which “permission to approach” and “authority